 "publisher": "Manufacturing AI",
 "url": "https://manufacturing.dbvantage.com",
 "updated": "2026-11-21",
 "license": "Cite Manufacturing AI and the original sources.",
 "data": [
  {
   "slug": "tsmc-arizona-phoenix",
   "company": "TSMC",
   "project": "TSMC Arizona (Fab 21) gigafab campus",
   "city": "Phoenix",
   "state": "AZ",
   "lat": 33.78,
   "lon": -112.13,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 265,
   "amount_note": "initial $12B (May 2020); $40B (Dec 2022); $65B (2024); raised to $165B incl. 6 fabs, 2 advanced packaging plants and an R&D center (Mar 2025); further $100B announced Jul 2026 for a $265B total (10 fabs, 2 packaging facilities, R&D center)",
   "jobs_announced": null,
   "announced": "2020-05",
   "status": "Operating",
   "status_note": "Fab 1 (N4) in high-volume production since late 2024; Fab 2 construction complete, 3nm production expected 2027; Fab 3 (N2/A16) broke ground 2025; Arizona workforce >3,500 (as of 2026-07)",
   "source_name": "ENR (Engineering News-Record)",
   "url": "https://www.enr.com/articles/63349-tsmc-arizona-megaprojec-grows-to-265-billion"
  },
  {
   "slug": "intel-ohio-one-new-albany",
   "company": "Intel",
   "project": "Ohio One leading-edge fab campus",
   "city": "New Albany",
   "state": "OH",
   "lat": 40.08,
   "lon": -82.81,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 28,
   "amount_note": "more than $28B for two leading-edge fabs (Intel); site often described as having up to $100B long-term potential; ~$5B reportedly spent through 2025",
   "jobs_announced": 3000,
   "announced": "2022-01",
   "status": "Delayed",
   "status_note": "Originally due to open 2025; Feb 2025 update moved Mod 1 completion to 2030 with operations 2030-2031 and Mod 2 operations to 2032; construction continuing at slower pace, first major structural truss installed on Fab 1 (as of 2026-10)",
   "source_name": "Intel Newsroom",
   "url": "https://www.intel.com/content/www/us/en/newsroom/news/corporate/ohio-one-construction-timeline-update.html"
  },
  {
   "slug": "intel-arizona-fab-52-chandler",
   "company": "Intel",
   "project": "Fab 52 (Intel 18A) at Ocotillo campus",
   "city": "Chandler",
   "state": "AZ",
   "lat": 33.3,
   "lon": -111.84,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 32,
   "amount_note": "Fabs 52 and 62 expansion described at a total of about $32B (no separate Fab 52 figure); construction of Fab 52 began end of 2021",
   "jobs_announced": null,
   "announced": "2021",
   "status": "Operating",
   "status_note": "Fab 52 in high-volume 18A production (Panther Lake, Clearwater Forest) since late 2025; sister Fab 62 installing equipment, operations expected by end of 2028 (as of 2026-10)",
   "source_name": "Igor's Lab",
   "url": "https://www.igorslab.de/en/intels-fab-52-new-production-facility-for-the-18a-process-in-arizona/"
  },
  {
   "slug": "samsung-taylor-tx",
   "company": "Samsung Electronics",
   "project": "Taylor leading-edge logic fab (2nm)",
   "city": "Taylor",
   "state": "TX",
   "lat": 30.57,
   "lon": -97.41,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 37,
   "amount_note": "announced 2021 (originally reported as a $17B plant); 'over $37B' Central Texas investment (two leading-edge logic fabs + R&D fab in Taylor plus Austin expansion) backing a $4.745B CHIPS award (Dec 2024)",
   "jobs_announced": 3500,
   "announced": "2021",
   "status": "Under construction",
   "status_note": "Mass production originally planned for 2024, later pushed to 2026; Samsung says target is readiness for mass production by end-2026; Tesla AI5/AI6 2nm chips slated for the fab, volume output expected 2027 (as of 2026-07)",
   "source_name": "NIST / U.S. Department of Commerce",
   "url": "https://www.nist.gov/news-events/news/2024/12/biden-harris-administration-announces-chips-incentives-award-samsung"
  },
  {
   "slug": "micron-clay-ny-megafab",
   "company": "Micron Technology",
   "project": "New York DRAM megafab (up to 4 fabs)",
   "city": "Clay",
   "state": "NY",
   "lat": 43.19,
   "lon": -76.17,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 100,
   "amount_note": "up to $100B over ~20 years for a four-fab campus at White Pine Commerce Park; part of Micron's ~$200B U.S. plan; $6.1B CHIPS award (Apr 2024) shared with Idaho",
   "jobs_announced": 9000,
   "announced": "2022",
   "status": "Under construction",
   "status_note": "Groundbreaking delayed from 2024 by environmental/wetlands permitting; broke ground 2026-01-16; first foundations placed Jul 2026; first fabs targeted to come online ~2030 (as of 2026-07)",
   "source_name": "The Register",
   "url": "https://www.theregister.com/2026/01/16/micron_fab_breaks_ground/"
  },
  {
   "slug": "micron-boise-id",
   "company": "Micron Technology",
   "project": "Boise DRAM fabs ID1 and ID2",
   "city": "Boise",
   "state": "ID",
   "lat": 43.62,
   "lon": -116.2,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 50,
   "amount_note": "$15B Boise fab announced 2022; now two Idaho fabs at ~$25B each over two decades (Micron spokesperson), within ~$200B U.S. plan (Jun 2025)",
   "jobs_announced": 2000,
   "announced": "2022",
   "status": "Under construction",
   "status_note": "ID1 first DRAM wafer output expected mid-2027; ID2 first wafers expected late 2028 (as of 2026-10)",
   "source_name": "Idaho Statesman via The Spokesman-Review",
   "url": "https://www.spokesman.com/stories/2026/mar/11/uss-biggest-memory-chip-maker-boises-micron-booms-/"
  },
  {
   "slug": "texas-instruments-sherman-tx",
   "company": "Texas Instruments",
   "project": "Sherman 300mm analog fabs SM1-SM4",
   "city": "Sherman",
   "state": "TX",
   "lat": 33.64,
   "lon": -96.61,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 40,
   "amount_note": "up to four connected 300mm fabs, potential $40B at Sherman (earlier described as ~$30B); part of TI's >$60B plan for seven U.S. fabs in Texas and Utah (Jun 2025)",
   "jobs_announced": 3000,
   "announced": "2021-11",
   "status": "Operating",
   "status_note": "Groundbreaking May 2022; SM1 began production 2025-12-17 and is ramping with demand; SM2 construction reported complete, later fabs to follow demand (as of 2025-12)",
   "source_name": "Dallas Innovates",
   "url": "https://dallasinnovates.com/texas-instruments-starts-production-at-new-semiconductor-fab-in-north-texas/"
  },
  {
   "slug": "texas-instruments-lehi-ut",
   "company": "Texas Instruments",
   "project": "LFAB2 300mm wafer fab",
   "city": "Lehi",
   "state": "UT",
   "lat": 40.39,
   "lon": -111.85,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 11,
   "amount_note": "$11B for LFAB2, connected to existing LFAB1 (acquired 2021); largest economic investment in Utah history",
   "jobs_announced": 800,
   "announced": "2023-02",
   "status": "Under construction",
   "status_note": "Groundbreaking Nov 2023; foundation poured 2025; final truss installed 2026; production originally targeted as early as 2026, no confirmed production start found (as of 2026-10)",
   "source_name": "Texas Instruments",
   "url": "https://www.ti.com/about-ti/company/ti-at-a-glance/manufacturing/lehi.html"
  },
  {
   "slug": "globalfoundries-malta-ny",
   "company": "GlobalFoundries",
   "project": "Fab 8 expansion and new Malta fab",
   "city": "Malta",
   "state": "NY",
   "lat": 42.98,
   "lon": -73.79,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 11.6,
   "amount_note": ">$11.6B over 10 years in Malta, NY (Feb 2024; Fab 8 expansion + new 358,000 sq ft fab); company-wide U.S. plan raised to $16B across NY and VT (Jun 2025); up to $1.587B CHIPS award",
   "jobs_announced": 1500,
   "announced": "2024-02",
   "status": "Announced",
   "status_note": "Existing Fab 8 operating; construction of new Malta fab was expected to begin in 2025, but no confirmed 2026 construction update found (as of 2026-11)",
   "source_name": "New York Governor's Office",
   "url": "https://www.governor.ny.gov/news/governor-hochul-celebrates-globalfoundries-116-billion-investment-expand-semiconductor"
  },
  {
   "slug": "wolfspeed-siler-city-nc",
   "company": "Wolfspeed",
   "project": "John Palmour Manufacturing Center (200mm SiC materials)",
   "city": "Siler City",
   "state": "NC",
   "lat": 35.72,
   "lon": -79.46,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 5,
   "amount_note": "$5B silicon carbide crystal/200mm wafer materials facility",
   "jobs_announced": 1800,
   "announced": "2022",
   "status": "Operating",
   "status_note": "First crystal furnaces powered Jun 2024; reached production readiness late fiscal 2025; Wolfspeed filed Chapter 11 in Jun 2025 and emerged 2025-09-29 with ~70% less debt (as of 2025-10)",
   "source_name": "Compound Semiconductor",
   "url": "https://compoundsemiconductor.net/article/122836/Wolfspeed_reports_Q1_results"
  },
  {
   "slug": "amkor-peoria-az",
   "company": "Amkor Technology",
   "project": "Advanced packaging and test campus",
   "city": "Peoria",
   "state": "AZ",
   "lat": 33.58,
   "lon": -112.24,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 12,
   "amount_note": "~$2B (Nov 2023); ~$7B for two phases at groundbreaking (Oct 2025); Phase 2 raised total to ~$12B (Sep 2026); up to $407M CHIPS award; Apple and NVIDIA named customers",
   "jobs_announced": 3500,
   "announced": "2023-11",
   "status": "Under construction",
   "status_note": "Phase 1 broke ground Oct 2025, production slated for early 2028; Phase 2 construction to begin late 2027, finishing by end of 2029 (as of 2026-09)",
   "source_name": "The Next Web",
   "url": "https://thenextweb.com/news/amkor-arizona-phase-2-advanced-packaging-12bn"
  },
  {
   "slug": "sk-hynix-west-lafayette-in",
   "company": "SK hynix",
   "project": "HBM advanced packaging plant, Purdue Research Park",
   "city": "West Lafayette",
   "state": "IN",
   "lat": 40.43,
   "lon": -86.91,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 4,
   "amount_note": "$3.87B (Apr 2024 announcement); now described as more than $4B",
   "jobs_announced": 1000,
   "announced": "2024-04",
   "status": "Under construction",
   "status_note": "Construction began Apr 2026, ceremonial groundbreaking 2026-08-27; cleanroom operations 2H 2028, HBM4E volume production targeted Q3 2029 (as of 2026-08)",
   "source_name": "The Korea Times (Reuters)",
   "url": "https://www.koreatimes.co.kr/world/20260828/sk-hynix-to-start-ai-chip-volume-production-in-indiana-in-2029"
  },
  {
   "slug": "globalwafers-sherman-tx",
   "company": "GlobalWafers (GlobiTech)",
   "project": "300mm silicon wafer plant",
   "city": "Sherman",
   "state": "TX",
   "lat": 33.64,
   "lon": -96.6,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 7.5,
   "amount_note": "$3.5B facility opened May 2025; additional $4B U.S. expansion announced at opening for $7.5B total; Micron later took a $500M strategic financing position in the plant",
   "jobs_announced": 650,
   "announced": "2022-06",
   "status": "Operating",
   "status_note": "Grand opening 2025-05-15, first fully integrated 300mm wafer line built in U.S. in over two decades; phase two expansion being prepared subject to customer commitments (as of 2026-01)",
   "source_name": "Evertiq",
   "url": "https://evertiq.com/design/2025-05-21-globalwafers-opens-texas-wafer-plant-announces-major-expansionr"
  },
  {
   "slug": "absolics-covington-ga",
   "company": "Absolics (SKC)",
   "project": "Glass substrate plant for advanced packaging",
   "city": "Covington",
   "state": "GA",
   "lat": 33.6,
   "lon": -83.86,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 0.6,
   "amount_note": "$600M plant; up to $75M CHIPS award plus $100M via advanced packaging R&D program with Georgia Tech",
   "jobs_announced": 410,
   "announced": "2021",
   "status": "Delayed",
   "status_note": "Plant built; mass production originally planned 1H 2024, slipped repeatedly; mass-production samples in customer qualification, mass production targeted by end-2026 (as of 2026-08)",
   "source_name": "Tom's Hardware",
   "url": "https://tomshardware.com/tech-industry/manufacturing/glass-substrate-roadmap-examined"
  },
  {
   "slug": "apple-houston-ai-server-factory",
   "company": "Apple",
   "project": "Houston AI server factory (Private Cloud Compute servers)",
   "city": "Houston",
   "state": "TX",
   "lat": 29.88,
   "lon": -95.42,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": null,
   "amount_note": "site amount not disclosed; part of Apple's U.S. commitment of $500B (Feb 2025), raised to $600B (Aug 2025); 250,000 sq ft factory; Mac mini factory and Advanced Manufacturing Center added on site (Feb 2026)",
   "jobs_announced": null,
   "announced": "2025-02",
   "status": "Operating",
   "status_note": "AI server production began 2025 ahead of schedule (shipping since Oct 2025); Mac mini production to start at new factory on the Houston site later in 2026 (as of 2026-02)",
   "source_name": "Apple Newsroom",
   "url": "https://www.apple.com/newsroom/2026/02/apple-accelerates-us-manufacturing-with-mac-mini-production/"
  },
  {
   "slug": "corning-harrodsburg-ky-apple-glass",
   "company": "Corning (with Apple)",
   "project": "iPhone/Apple Watch cover glass line",
   "city": "Harrodsburg",
   "state": "KY",
   "lat": 37.76,
   "lon": -84.84,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 2.5,
   "amount_note": "$2.5B Apple commitment to make all iPhone and Apple Watch cover glass at Corning's Harrodsburg plant, part of Apple's $600B U.S. pledge",
   "jobs_announced": null,
   "announced": "2025-08",
   "status": "Operating",
   "status_note": "Existing plant expanding; Corning's Kentucky workforce to grow 50%; all new iPhone and Apple Watch cover glass to be made there by end of 2026 (as of 2026-02)",
   "source_name": "Apple Newsroom",
   "url": "https://www.apple.com/newsroom/2025/08/apple-corning-to-manufacture-all-iphone-apple-watch-cover-glass-in-kentucky"
  },
  {
   "slug": "foxconn-houston-nvidia-ai-systems",
   "company": "Foxconn (for NVIDIA)",
   "project": "NVIDIA AI supercomputer / GB300 system factory",
   "city": "Houston",
   "state": "TX",
   "lat": 29.9,
   "lon": -95.58,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": null,
   "amount_note": "site amount not disclosed by NVIDIA/Foxconn; part of NVIDIA's plan to produce up to $500B of AI infrastructure in the U.S. within four years (Apr 2025)",
   "jobs_announced": null,
   "announced": "2025-04",
   "status": "Under construction",
   "status_note": "NVIDIA said in Apr 2025 that Texas plants would ramp in 12-15 months; Foxconn still described as building the Houston factory for NVIDIA AI systems incl. GB300 tray modules, no production start confirmed (as of 2026-08)",
   "source_name": "NVIDIA Blog",
   "url": "https://blogs.nvidia.com/blog/nvidia-and-partners-build-in-america-for-america/"
  },
  {
   "slug": "wistron-fort-worth-nvidia",
   "company": "Wistron (for NVIDIA)",
   "project": "D1 NVIDIA AI superchip/board plant",
   "city": "Fort Worth",
   "state": "TX",
   "lat": 32.76,
   "lon": -97.33,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 0.7,
   "amount_note": "$700M U.S. advanced manufacturing commitment; 324,000 sq ft greenfield plant (originally described as Dallas-area in Apr 2025); part of NVIDIA's up to $500B U.S. AI infrastructure plan",
   "jobs_announced": 1000,
   "announced": "2025-04",
   "status": "Operating",
   "status_note": "Mass production began Jul 2026, grand opening 2026-07-21; producing NVIDIA GB300 superchips, second cell for Vera Rubin; >500 jobs, 1,000 planned by end-2026 (as of 2026-07)",
   "source_name": "NVIDIA Blog",
   "url": "https://blogs.nvidia.com/blog/wistron-manufacturing-texas/"
  },
  {
   "slug": "bosch-roseville-ca-sic",
   "company": "Bosch",
   "project": "Roseville silicon carbide chip fab conversion",
   "city": "Roseville",
   "state": "CA",
   "lat": 38.75,
   "lon": -121.29,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 2,
   "amount_note": "acquisition of existing Roseville fab announced Apr 2023 (closed Aug 2023); up to $2B to convert it to SiC; up to $225M CHIPS direct funding plus $25M California Competes credit",
   "jobs_announced": null,
   "announced": "2023-04",
   "status": "Operating",
   "status_note": "SiC sample production began (announced 2026-07-13); first commercial 200mm SiC chips planned for 2026; site employs >300 (as of 2026-07)",
   "source_name": "City of Roseville",
   "url": "https://www.roseville.ca.gov/articles/Bosch-announces-225-million-direct-funding-agreement-with-the-US-Department-of-Commerce-as-part-of-a-2-billion-investment-in-Roseville-859.php"
  },
  {
   "slug": "applied-materials-epic-sunnyvale",
   "company": "Applied Materials",
   "project": "EPIC Center (semiconductor equipment R&D)",
   "city": "Sunnyvale",
   "state": "CA",
   "lat": 37.37,
   "lon": -122.04,
   "industry": "semiconductors-electronics",
   "amount_usd_billions": 5,
   "amount_note": "capital spending expected to scale to ~$5B over time as customer projects commence; R&D/commercialization facility, not volume manufacturing",
   "jobs_announced": null,
   "announced": "2023",
   "status": "Operating",
   "status_note": "Opened 2026-10-12 with founding partners TSMC, Intel, Samsung, Micron, SK hynix; 600,000 sq ft with ~4 acres of cleanroom (as of 2026-10)",
   "source_name": "Evertiq",
   "url": "https://evertiq.com/design/2026-10-13-applied-materials-opens-5-billion-epic-center-in-silicon-valley"
  },
  {
   "slug": "hyundai-metaplant-ellabell",
   "company": "Hyundai Motor Group",
   "project": "Metaplant America EV assembly campus",
   "city": "Ellabell",
   "state": "GA",
   "lat": 32.13,
   "lon": -81.48,
   "industry": "automotive",
   "amount_usd_billions": 7.6,
   "amount_note": "Initial $5.54B (2022); AJC (Apr 2026) puts the Metaplant campus at $7.6B; Hyundai Group's Georgia total is often cited at $12.6B including the battery JVs",
   "jobs_announced": 8500,
   "announced": "2022-05",
   "status": "Operating",
   "status_note": "Builds Ioniq 5 and Ioniq 9. ICE raid on the HL-GA battery JV site on 2025-09-04 (about 475 detained, 300+ Korean nationals) delayed the battery plant by several months (AJC, Apr 2026)",
   "source_name": "Atlanta Journal-Constitution",
   "url": "https://www.ajc.com/business/2026/04/hyundai-battery-plant-in-georgia-set-to-open-months-after-ice-raid/"
  },
  {
   "slug": "hl-ga-battery-ellabell",
   "company": "HL-GA Battery Co. (Hyundai Motor Group / LG Energy Solution)",
   "project": "Metaplant battery cell JV plant",
   "city": "Ellabell",
   "state": "GA",
   "lat": 32.13,
   "lon": -81.48,
   "industry": "electrical-batteries",
   "amount_usd_billions": null,
   "amount_note": "AJC gives no JV-specific figure; part of Hyundai's Georgia program",
   "jobs_announced": null,
   "announced": "2023-05",
   "status": "Under construction",
   "status_note": "Site of the 2025-09-04 ICE raid. As of 2026-04-15 the plant had 500+ employees and was set to open later in April 2026 after the raid delay. Opening was not independently confirmed",
   "source_name": "Atlanta Journal-Constitution",
   "url": "https://www.ajc.com/business/2026/04/hyundai-battery-plant-in-georgia-set-to-open-months-after-ice-raid/"
  },
  {
   "slug": "ford-blueoval-city-stanton",
   "company": "Ford Motor Co.",
   "project": "BlueOval City / Tennessee Truck Plant",
   "city": "Stanton",
   "state": "TN",
   "lat": 35.46,
   "lon": -89.4,
   "industry": "automotive",
   "amount_usd_billions": 5.6,
   "amount_note": "$5.6B Ford investment announced 2021, part of the $11.4B Ford/SK On program",
   "jobs_announced": 5800,
   "announced": "2021-09",
   "status": "Delayed",
   "status_note": "Dec 2025: Ford dropped the next-gen electric pickup and renamed the site Tennessee Truck Plant. Gas-powered trucks are planned from 2029. Site had 80 employees in Dec 2025",
   "source_name": "Tennessee Lookout (via Yahoo News)",
   "url": "https://www.yahoo.com/news/articles/ford-changed-direction-plans-west-110015860.html"
  },
  {
   "slug": "sk-on-blueoval-city-battery-stanton",
   "company": "SK On (formerly BlueOval SK, Ford/SK On JV)",
   "project": "BlueOval City battery plant",
   "city": "Stanton",
   "state": "TN",
   "lat": 35.46,
   "lon": -89.4,
   "industry": "electrical-batteries",
   "amount_usd_billions": null,
   "amount_note": "Part of the $11.4B Ford/SK On three-plant plan (2021); no plant-specific figure verified",
   "jobs_announced": null,
   "announced": "2021-09",
   "status": "Delayed",
   "status_note": "JV split announced Dec 2025, SK On takes sole ownership (Tennessee Lookout reports it took control May 2026). Construction complete, about 300 staff; commercial production now expected 2028, including energy storage",
   "source_name": "Tennessee Lookout (via Yahoo News)",
   "url": "https://www.yahoo.com/news/articles/ford-changed-direction-plans-west-110015860.html"
  },
  {
   "slug": "ford-energy-glendale-ky",
   "company": "Ford Motor Co. (Ford Energy; formerly BlueOval SK)",
   "project": "BlueOval SK Battery Park, converted to energy storage",
   "city": "Glendale",
   "state": "KY",
   "lat": 37.6,
   "lon": -85.91,
   "industry": "electrical-batteries",
   "amount_usd_billions": null,
   "amount_note": "Originally part of the $11.4B Ford/SK On plan (2 KY plants); KY-specific figure not verified. Ford plans about $2B to stand up its Ford Energy storage business",
   "jobs_announced": null,
   "announced": "2021-09",
   "status": "Under construction",
   "status_note": "BlueOval SK JV dissolved (announced Dec 2025, Ford took the KY plants). EV cell output ended with about 1,500 layoffs. Being repurposed for LFP energy storage under Ford Energy (launched 2026-05-11); first deliveries planned late 2027",
   "source_name": "Ford Motor Co.",
   "url": "https://www.at.ford.com/us/en/home/news-media/news/2026/5/ford-energy.html"
  },
  {
   "slug": "ford-blueoval-battery-park-marshall",
   "company": "Ford Motor Co.",
   "project": "BlueOval Battery Park Michigan (LFP cells)",
   "city": "Marshall",
   "state": "MI",
   "lat": 42.27,
   "lon": -84.96,
   "industry": "electrical-batteries",
   "amount_usd_billions": 3.5,
   "amount_note": "$3.5B per Ford corporate page; a June 2025 Ford post put Ford's own investment at $3B. Capacity scope cut from about 35 GWh to about 20 GWh (2024)",
   "jobs_announced": 1700,
   "announced": "2023-02",
   "status": "Operating",
   "status_note": "First LFP prismatic cells shipped to Louisville Assembly for Ford prototypes (Ford, 2026-11-18). Pack plant due 2027. 500+ employees as of Jun 2026",
   "source_name": "Ford Motor Co. (From the Road)",
   "url": "https://www.fromtheroad.ford.com/us/en/articles/2026/ford-fathom-lfp-prismatic-battery-cells-ship.html"
  },
  {
   "slug": "toyota-battery-nc-liberty",
   "company": "Toyota Battery Manufacturing North Carolina",
   "project": "Battery plant (HEV/PHEV/BEV)",
   "city": "Liberty",
   "state": "NC",
   "lat": 35.86,
   "lon": -79.57,
   "industry": "electrical-batteries",
   "amount_usd_billions": 13.9,
   "amount_note": "Initial $1.29B (2021); raised in steps to $13.9B",
   "jobs_announced": 5100,
   "announced": "2021-12",
   "status": "Operating",
   "status_note": "Production start celebrated 2025-11-12. Ships HEV modules to Toyota Kentucky and Mazda Toyota; 14 lines planned by 2030, 30 GWh at full capacity",
   "source_name": "Toyota Pressroom",
   "url": "https://pressroom.toyota.com/?p=110937"
  },
  {
   "slug": "panasonic-energy-de-soto",
   "company": "Panasonic Energy",
   "project": "EV battery cell gigafactory",
   "city": "De Soto",
   "state": "KS",
   "lat": 38.98,
   "lon": -94.97,
   "industry": "electrical-batteries",
   "amount_usd_billions": 4.0,
   "amount_note": "$4B as announced (figure from S&P/Design News coverage, not the cited page)",
   "jobs_announced": 4000,
   "announced": "2022-07",
   "status": "Operating",
   "status_note": "Opened Jul 2025 making Tesla 2170 cells. Full-capacity ramp postponed indefinitely; 4 lines and 1,800 staff as of Jun 2026. Part of the plant shifts to data-center battery cells from about 2028-29",
   "source_name": "KCUR",
   "url": "https://www.kcur.org/housing-development-section/2026-06-17/panasonics-de-soto-plant-ai-data-center-batteries"
  },
  {
   "slug": "ultium-cells-warren",
   "company": "Ultium Cells (GM / LG Energy Solution)",
   "project": "Ultium Cells plant 1",
   "city": "Warren",
   "state": "OH",
   "lat": 41.24,
   "lon": -80.84,
   "industry": "electrical-batteries",
   "amount_usd_billions": 2.3,
   "amount_note": "$2.3B as announced in 2019 (Lordstown/Warren); figure from search coverage, not the cited page",
   "jobs_announced": null,
   "announced": "2019-12",
   "status": "Operating",
   "status_note": "Idled Jan 2026 (about 1,330 laid off). Restart of NCMA pouch-cell lines announced Aug 2026 with about 1,400 workers; over 45 GWh capacity",
   "source_name": "InsideEVs",
   "url": "https://insideevs.com/news/804775/gm-lg-ultium-cells-production-restart-ohio/"
  },
  {
   "slug": "ultium-cells-spring-hill",
   "company": "Ultium Cells (GM / LG Energy Solution)",
   "project": "Ultium Cells plant 2",
   "city": "Spring Hill",
   "state": "TN",
   "lat": 35.75,
   "lon": -86.93,
   "industry": "electrical-batteries",
   "amount_usd_billions": 2.6,
   "amount_note": "$2.3B (Apr 2021) plus $275M (Dec 2022), about $2.575B; plus $70M retool for LFP storage cells (2026)",
   "jobs_announced": 1300,
   "announced": "2021-04",
   "status": "Operating",
   "status_note": "Paused Jan 2026 (710 furloughed). Mar 2026: retooling to LFP cells for stationary storage (for LGES Vertech); workers recalled, output targeted Q2 2026",
   "source_name": "Electrek",
   "url": "https://electrek.co/2026/03/18/gm-lg-shifts-a-us-plant-from-ev-batteries-to-lfp-energy-storage/"
  },
  {
   "slug": "lges-lansing",
   "company": "LG Energy Solution (formerly Ultium Cells plant 3)",
   "project": "LGES Michigan-Lansing battery plant",
   "city": "Lansing",
   "state": "MI",
   "lat": 42.72,
   "lon": -84.66,
   "industry": "electrical-batteries",
   "amount_usd_billions": 2.0,
   "amount_note": "LGES says more than $2B invested since 2022. Originally the GM/LGES Ultium plant 3; GM sold its stake to LGES in early 2025",
   "jobs_announced": 1700,
   "announced": "2022",
   "status": "Operating",
   "status_note": "Production began 2026-08-18: LFP storage cells and NMC cells for Toyota EVs; about 900 staff, more than 35 GWh at full scale",
   "source_name": "LG Energy Solution",
   "url": "https://inside.lgensol.com/en/?p=48840"
  },
  {
   "slug": "rivian-georgia-stanton-springs",
   "company": "Rivian",
   "project": "Georgia EV plant (R2)",
   "city": "Social Circle",
   "state": "GA",
   "lat": 33.65,
   "lon": -83.72,
   "industry": "automotive",
   "amount_usd_billions": 5.0,
   "amount_note": "$5B pledged. DOE loan of $6.6B (closed Jan 2025) amended Apr 2026 to $4.5B (principal just over $4B)",
   "jobs_announced": 7500,
   "announced": "2021-12",
   "status": "Under construction",
   "status_note": "Paused Mar 2024; groundbreaking Sep 2025 at Stanton Springs North. First phase (300,000/yr) targeted for late 2028; vertical construction ramping in summer 2026",
   "source_name": "Atlanta Journal-Constitution",
   "url": "https://www.ajc.com/business/2026/04/rivian-to-boost-ev-production-at-planned-georgia-plant-shrinks-doe-loan/"
  },
  {
   "slug": "scout-motors-blythewood",
   "company": "Scout Motors (Volkswagen Group)",
   "project": "Scout Production Center",
   "city": "Blythewood",
   "state": "SC",
   "lat": 34.21,
   "lon": -80.97,
   "industry": "automotive",
   "amount_usd_billions": 2.0,
   "amount_note": "$2B plant plus $300M onsite supplier park",
   "jobs_announced": 4000,
   "announced": "2023",
   "status": "Delayed",
   "status_note": "Validation builds started Nov 2026. Customer deliveries of Traveler and Terra now 2028, versus the original 2026 target",
   "source_name": "Electrek",
   "url": "https://electrek.co/2026/11/17/scout-motors-validation-builds-south-carolina-deliveries-2028/"
  },
  {
   "slug": "honda-central-ohio-hybrid-plant",
   "company": "American Honda Motor Co.",
   "project": "New Central Ohio auto plant (hybrid/flex)",
   "city": "Marysville",
   "state": "OH",
   "lat": 40.27,
   "lon": -83.47,
   "industry": "automotive",
   "amount_usd_billions": 3.0,
   "amount_note": "$3B new plant, part of a multi-facility hybrid investment",
   "jobs_announced": 2000,
   "announced": "2026-11",
   "status": "Announced",
   "status_note": "Announced 2026-11-09. Sited between the East Liberty and Marysville plants; up to 240,000 vehicles/yr from 2029, pending approvals",
   "source_name": "Honda News",
   "url": "https://hondanews.com/en-US/honda-corporate/releases/release-b26ae02ff5dca50cb32a1f4783115123-honda-to-boost-us-hybrid-production-with-new-3-billion-us-auto-plant-and-investments-in-multiple-facilities"
  },
  {
   "slug": "lilly-lebanon-leap",
   "company": "Eli Lilly and Co.",
   "project": "Lebanon API site (LEAP district)",
   "city": "Lebanon",
   "state": "IN",
   "lat": 40.05,
   "lon": -86.47,
   "industry": "pharmaceuticals",
   "amount_usd_billions": 9.0,
   "amount_note": "Raised from $3.7B to $9B in May 2024 (tirzepatide API)",
   "jobs_announced": 900,
   "announced": "2022",
   "status": "Under construction",
   "status_note": "Broke ground 2023. Lilly (May 2024) expected to begin making medicines toward the end of 2026, scaling through 2028; production start not confirmed",
   "source_name": "Eli Lilly (PR Newswire)",
   "url": "https://www.prnewswire.com/news-releases/lilly-increases-manufacturing-investment-to-9-billion-at-newest-indiana-site-to-boost-api-production-for-tirzepatide-and-pipeline-medicines-302155135.html"
  },
  {
   "slug": "lilly-goochland-va",
   "company": "Eli Lilly and Co.",
   "project": "Richmond-area manufacturing site (cancer medicines, ADCs)",
   "city": "Goochland",
   "state": "VA",
   "lat": 37.6,
   "lon": -77.7,
   "industry": "pharmaceuticals",
   "amount_usd_billions": 5.0,
   "amount_note": "$5B",
   "jobs_announced": 650,
   "announced": "2025-09",
   "status": "Under construction",
   "status_note": "Broke ground 2026-10-22 in Goochland County; about 1,800 construction jobs",
   "source_name": "Eli Lilly (PR Newswire)",
   "url": "https://www.prnewswire.com/news-releases/lilly-breaks-ground-in-richmond-to-expand-american-manufacturing-of-next-generation-cancer-medicines-advancing-its-build-out-of-10-new-us-sites-since-2020-302916266.html"
  },
  {
   "slug": "lilly-houston-api",
   "company": "Eli Lilly and Co.",
   "project": "Houston API facility (Generation Park)",
   "city": "Houston",
   "state": "TX",
   "lat": 29.93,
   "lon": -95.17,
   "industry": "pharmaceuticals",
   "amount_usd_billions": 6.5,
   "amount_note": "$6.5B",
   "jobs_announced": 600,
   "announced": "2025-09",
   "status": "Under construction",
   "status_note": "Broke ground 2026-09-21; APIs for orforglipron (Foundayo) and oligonucleotides",
   "source_name": "Eli Lilly (PR Newswire)",
   "url": "https://www.prnewswire.com/news-releases/lilly-breaks-ground-in-houston-one-of-ten-us-manufacturing-sites-announced-since-2020-302885255.html"
  },
  {
   "slug": "lilly-huntsville-api",
   "company": "Eli Lilly and Co.",
   "project": "Huntsville API facility (Greenbrier South)",
   "city": "Huntsville",
   "state": "AL",
   "lat": 34.68,
   "lon": -86.8,
   "industry": "pharmaceuticals",
   "amount_usd_billions": 6.0,
   "amount_note": "More than $6B",
   "jobs_announced": 450,
   "announced": "2025-12",
   "status": "Announced",
   "status_note": "Dec 2025: construction expected to begin in 2026, completion targeted 2032; groundbreaking not verified",
   "source_name": "Eli Lilly (PR Newswire)",
   "url": "https://www.prnewswire.com/news-releases/lilly-to-build-6-billion-facility-to-manufacture-active-pharmaceutical-ingredients-in-alabama-302635568.html"
  },
  {
   "slug": "lilly-lehigh-valley-pa",
   "company": "Eli Lilly and Co.",
   "project": "Lehigh Valley injectables/device site",
   "city": "Fogelsville",
   "state": "PA",
   "lat": 40.58,
   "lon": -75.63,
   "industry": "pharmaceuticals",
   "amount_usd_billions": 3.5,
   "amount_note": "$3.5B (announced Jan 2026 as $3.5B+)",
   "jobs_announced": 850,
   "announced": "2026-01",
   "status": "Under construction",
   "status_note": "Broke ground 2026-11-12 in Upper Macungie Twp; expected operational by 2031",
   "source_name": "Eli Lilly (PR Newswire)",
   "url": "https://www.prnewswire.com/news-releases/lilly-breaks-ground-in-pennsylvanias-lehigh-valley-on-a-3-5-billion-site-to-make-next-generation-obesity-medicines-the-latest-of-10-new-us-sites-since-2020--302938234.html"
  },
  {
   "slug": "gotion-big-rapids",
   "company": "Gotion Inc.",
   "project": "EV battery component plant (Green Charter Twp)",
   "city": "Big Rapids",
   "state": "MI",
   "lat": 43.73,
   "lon": -85.48,
   "industry": "electrical-batteries",
   "amount_usd_billions": 2.4,
   "amount_note": "$2.4B (often cited as $2.36B); state pledged $175M and bought 270 acres",
   "jobs_announced": 2350,
   "announced": "2022-10",
   "status": "Canceled",
   "status_note": "State default letter 2025-09-17; Michigan declared the project dead Oct 2025 and seeks about $23.6M back. Gotion sued the township in Jun 2026",
   "source_name": "Bridge Michigan",
   "url": "https://bridgemi.com/business-watch/michigan-gotion-battery-plant-plan-is-dead-after-years-of-controversy/"
  },
  {
   "slug": "first-solar-iberia-parish",
   "company": "First Solar",
   "project": "Louisiana thin-film module factory",
   "city": "New Iberia",
   "state": "LA",
   "lat": 30.0,
   "lon": -91.82,
   "industry": "energy-equipment",
   "amount_usd_billions": 1.1,
   "amount_note": "$1.1B, 3.5 GW/yr",
   "jobs_announced": 826,
   "announced": "2023",
   "status": "Operating",
   "status_note": "Production began quietly Jul 2025; ribbon cutting Nov 2025 with 700+ employees",
   "source_name": "Electrek",
   "url": "https://electrek.co/2025/11/21/first-solar-opens-a-louisiana-factory-thats-11-superdomes-big/"
  },
  {
   "slug": "first-solar-gaffney-sc",
   "company": "First Solar",
   "project": "South Carolina Series 6 module finishing line",
   "city": "Gaffney",
   "state": "SC",
   "lat": 35.07,
   "lon": -81.65,
   "industry": "energy-equipment",
   "amount_usd_billions": null,
   "amount_note": "No amount in the cited article body; a linked headline cites $330M (not verified)",
   "jobs_announced": null,
   "announced": "2025-11",
   "status": "Announced",
   "status_note": "Announced Nov 2025, expected online 2027 (Electrek, Nov 2025); pv magazine (Nov 2026) lists Gaffney as a 2026 capex driver",
   "source_name": "Electrek",
   "url": "https://electrek.co/2025/11/21/first-solar-opens-a-louisiana-factory-thats-11-superdomes-big/"
  },
  {
   "slug": "hyundai-steel-donaldsonville",
   "company": "Hyundai Steel",
   "project": "Louisiana electric arc furnace steel mill",
   "city": "Donaldsonville",
   "state": "LA",
   "lat": 30.1,
   "lon": -90.99,
   "industry": "metals-fabrication",
   "amount_usd_billions": 5.8,
   "amount_note": "$5.8B",
   "jobs_announced": 1300,
   "announced": "2025-03",
   "status": "Announced",
   "status_note": "Aug 2026 LED post: Hyundai Steel is preparing to build, still early stage; no groundbreaking or production timeline stated",
   "source_name": "Louisiana Economic Development",
   "url": "https://www.opportunitylouisiana.gov/news/momentum-in-action-hyundai-steel-opportunity-takes-shape"
  }
 ]
}