Case study · Chemicals

P&G Amiens applies analytics to warehouse planning and logistics

The fabric-care plant had to absorb a 30% volume increase over three years.

Manufacturer
Procter & Gamble
Use cases
2
Evidence
Independently assessed
Year
2021

Independently assessed  This result was assessed or published by a party other than the manufacturer or its vendor (a World Economic Forum Lighthouse assessment, a government or institute report, or a peer-reviewed paper).

The challenge

The fabric-care plant had to absorb a 30% volume increase over three years.

The approach

P&G added digital twins for remote production optimization, analytics for dynamic warehouse resource planning and advanced analytics to optimize logistics.

Reported improvements

Percent change as reported by the source; hover for the exact wording

Packaging materials↓ 40%
On-time delivery↑ 9.8%
Inventory↓ 6%

3 use cases in this implementation

  1. Factory & process digital twins

    Digital twin for remote production optimization.

    • 6% Inventory
  2. Transportation & logistics optimization

    Analytics for dynamic warehouse resource planning.

    • 9.8% On-time delivery
  3. Transportation & logistics optimization

    Advanced analytics to optimize logistics.

    • 40% Packaging materials

Outcomes as reported by the source. We do not adjust, combine or extrapolate reported figures.

Related case studies

Put AI to work

Find the AI opportunities hiding in your plant.

Genvo, our implementation partner, works with manufacturers to pick the right first project, connect the systems you already run and put AI agents and tools into daily use, with people approving what goes out.

Assessments and consultations are provided by Genvo. How our partnership works.