Manufacturing Innovation Atlas
Where American manufacturing is being built
Geographic stories about the factories, institutes and technology hubs reshaping U.S. manufacturing. Every project is sourced to its announcement and tracked for status, including the ones that stalled.
- Projects tracked
- 43
- Announced value
- $705B
- Manufacturing USA institutes
- 19
- Tech Hubs
- 31
Stories
Four corridors of new investment
20 projects
Semiconductors & electronics
Chip fabs and electronics plants are the largest single wave of U.S. factory construction in decades, backed in part by the CHIPS and Science Act.
15 projects
Batteries, EVs & automotive
Battery cell plants and EV assembly lines stretch across the Southeast and Midwest, the so-called Battery Belt. Several projects have since been delayed, scaled back or canceled as EV demand shifted.
5 projects
Pharmaceuticals & medical
Drugmakers have announced large new U.S. plants for active ingredients and finished medicines, citing supply resilience and policy changes.
3 projects
Metals, energy equipment & heavy industry
Steel mills, solar panel factories, aerospace lines and other heavy industry round out the map.
Major announced investments
Hover a point for the project
Innovation hubs
Manufacturing USA institutes
Public-private institutes that run applied R&D, pilot facilities and workforce programs, many open to small and midsize members.
AFFOA (Advanced Functional Fabrics of America)
Cambridge, MA · DoD
Advanced functional fabrics and fibers
AIM Photonics (American Institute for Manufacturing Integrated Photonics)
Albany, NY · DoD
Integrated photonics
ARM Institute (Advanced Robotics for Manufacturing)
Pittsburgh, PA · DoD
Robotics, AI and automation for manufacturing
BioMADE (Bioindustrial Manufacturing and Design Ecosystem)
St. Paul, MN · DoD
Bioindustrial manufacturing
CESMII (The Smart Manufacturing Institute)
Los Angeles, CA · DOE
Smart manufacturing, sensors, data and modeling
CyManII (Cybersecurity Manufacturing Innovation Institute)
San Antonio, TX · DOE
Cybersecurity in manufacturing
EPIXC (Electrified Processes for Industrial eXCellence)
Tempe, AZ · DOE
Electrified industrial process heating
NIIMBL (National Institute for Innovation in Manufacturing Biopharmaceuticals)
Newark, DE · Commerce (NIST)
Biopharmaceutical manufacturing
RAPID (Rapid Advancement in Process Intensification Deployment Institute)
New York, NY · DOE
Chemical process intensification
SMART USA Institute (Semiconductor Manufacturing and Advanced Research with Twins)
Raleigh, NC · Commerce (NIST CHIPS)
Digital twins for semiconductor manufacturing (CHIPS)
Investment tracker
Every project we track
Amounts are as most recently announced by the company or government, not spending to date.
| Company & project | Location | Announced investment | Jobs announced | Status | Year | Source |
|---|---|---|---|---|---|---|
| TSMC TSMC Arizona (Fab 21) gigafab campus | Phoenix, AZ | $265B | — | Operating Fab 1 (N4) in high-volume production since late 2024; Fab 2 construction complete, 3nm production expected 2027; Fab 3 (N2/A16) broke ground 2025; Arizona workforce >3,500 (as of 2026-07) | 2020-05 | ENR (Engineering News-Record) |
| Micron Technology New York DRAM megafab (up to 4 fabs) | Clay, NY | $100B | 9,000 | Under construction Groundbreaking delayed from 2024 by environmental/wetlands permitting; broke ground 2026-01-16; first foundations placed Jul 2026; first fabs targeted to come online ~2030 (as of 2026-07) | 2022 | The Register |
| Micron Technology Boise DRAM fabs ID1 and ID2 | Boise, ID | $50B | 2,000 | Under construction ID1 first DRAM wafer output expected mid-2027; ID2 first wafers expected late 2028 (as of 2026-10) | 2022 | Idaho Statesman via The Spokesman-Review |
| Texas Instruments Sherman 300mm analog fabs SM1-SM4 | Sherman, TX | $40B | 3,000 | Operating Groundbreaking May 2022; SM1 began production 2025-12-17 and is ramping with demand; SM2 construction reported complete, later fabs to follow demand (as of 2025-12) | 2021-11 | Dallas Innovates |
| Samsung Electronics Taylor leading-edge logic fab (2nm) | Taylor, TX | $37B | 3,500 | Under construction Mass production originally planned for 2024, later pushed to 2026; Samsung says target is readiness for mass production by end-2026; Tesla AI5/AI6 2nm chips slated for the fab, volume output expected 2027 (as of 2026-07) | 2021 | NIST / U.S. Department of Commerce |
| Intel Fab 52 (Intel 18A) at Ocotillo campus | Chandler, AZ | $32B | — | Operating Fab 52 in high-volume 18A production (Panther Lake, Clearwater Forest) since late 2025; sister Fab 62 installing equipment, operations expected by end of 2028 (as of 2026-10) | 2021 | Igor's Lab |
| Intel Ohio One leading-edge fab campus | New Albany, OH | $28B | 3,000 | Delayed Originally due to open 2025; Feb 2025 update moved Mod 1 completion to 2030 with operations 2030-2031 and Mod 2 operations to 2032; construction continuing at slower pace, first major structural truss installed on Fab 1 (as of 2026-10) | 2022-01 | Intel Newsroom |
| Toyota Battery Manufacturing North Carolina Battery plant (HEV/PHEV/BEV) | Liberty, NC | $13.9B | 5,100 | Operating Production start celebrated 2025-11-12. Ships HEV modules to Toyota Kentucky and Mazda Toyota; 14 lines planned by 2030, 30 GWh at full capacity | 2021-12 | Toyota Pressroom |
| Amkor Technology Advanced packaging and test campus | Peoria, AZ | $12B | 3,500 | Under construction Phase 1 broke ground Oct 2025, production slated for early 2028; Phase 2 construction to begin late 2027, finishing by end of 2029 (as of 2026-09) | 2023-11 | The Next Web |
| GlobalFoundries Fab 8 expansion and new Malta fab | Malta, NY | $11.6B | 1,500 | Announced Existing Fab 8 operating; construction of new Malta fab was expected to begin in 2025, but no confirmed 2026 construction update found (as of 2026-11) | 2024-02 | New York Governor's Office |
| Texas Instruments LFAB2 300mm wafer fab | Lehi, UT | $11B | 800 | Under construction Groundbreaking Nov 2023; foundation poured 2025; final truss installed 2026; production originally targeted as early as 2026, no confirmed production start found (as of 2026-10) | 2023-02 | Texas Instruments |
| Eli Lilly and Co. Lebanon API site (LEAP district) | Lebanon, IN | $9B | 900 | Under construction Broke ground 2023. Lilly (May 2024) expected to begin making medicines toward the end of 2026, scaling through 2028; production start not confirmed | 2022 | Eli Lilly (PR Newswire) |
| Hyundai Motor Group Metaplant America EV assembly campus | Ellabell, GA | $7.6B | 8,500 | Operating Builds Ioniq 5 and Ioniq 9. ICE raid on the HL-GA battery JV site on 2025-09-04 (about 475 detained, 300+ Korean nationals) delayed the battery plant by several months (AJC, Apr 2026) | 2022-05 | Atlanta Journal-Constitution |
| GlobalWafers (GlobiTech) 300mm silicon wafer plant | Sherman, TX | $7.5B | 650 | Operating Grand opening 2025-05-15, first fully integrated 300mm wafer line built in U.S. in over two decades; phase two expansion being prepared subject to customer commitments (as of 2026-01) | 2022-06 | Evertiq |
| Eli Lilly and Co. Houston API facility (Generation Park) | Houston, TX | $6.5B | 600 | Under construction Broke ground 2026-09-21; APIs for orforglipron (Foundayo) and oligonucleotides | 2025-09 | Eli Lilly (PR Newswire) |
| Eli Lilly and Co. Huntsville API facility (Greenbrier South) | Huntsville, AL | $6B | 450 | Announced Dec 2025: construction expected to begin in 2026, completion targeted 2032; groundbreaking not verified | 2025-12 | Eli Lilly (PR Newswire) |
| Hyundai Steel Louisiana electric arc furnace steel mill | Donaldsonville, LA | $5.8B | 1,300 | Announced Aug 2026 LED post: Hyundai Steel is preparing to build, still early stage; no groundbreaking or production timeline stated | 2025-03 | Louisiana Economic Development |
| Ford Motor Co. BlueOval City / Tennessee Truck Plant | Stanton, TN | $5.6B | 5,800 | Delayed Dec 2025: Ford dropped the next-gen electric pickup and renamed the site Tennessee Truck Plant. Gas-powered trucks are planned from 2029. Site had 80 employees in Dec 2025 | 2021-09 | Tennessee Lookout (via Yahoo News) |
| Wolfspeed John Palmour Manufacturing Center (200mm SiC materials) | Siler City, NC | $5B | 1,800 | Operating First crystal furnaces powered Jun 2024; reached production readiness late fiscal 2025; Wolfspeed filed Chapter 11 in Jun 2025 and emerged 2025-09-29 with ~70% less debt (as of 2025-10) | 2022 | Compound Semiconductor |
| Applied Materials EPIC Center (semiconductor equipment R&D) | Sunnyvale, CA | $5B | — | Operating Opened 2026-10-12 with founding partners TSMC, Intel, Samsung, Micron, SK hynix; 600,000 sq ft with ~4 acres of cleanroom (as of 2026-10) | 2023 | Evertiq |
| Rivian Georgia EV plant (R2) | Social Circle, GA | $5B | 7,500 | Under construction Paused Mar 2024; groundbreaking Sep 2025 at Stanton Springs North. First phase (300,000/yr) targeted for late 2028; vertical construction ramping in summer 2026 | 2021-12 | Atlanta Journal-Constitution |
| Eli Lilly and Co. Richmond-area manufacturing site (cancer medicines, ADCs) | Goochland, VA | $5B | 650 | Under construction Broke ground 2026-10-22 in Goochland County; about 1,800 construction jobs | 2025-09 | Eli Lilly (PR Newswire) |
| SK hynix HBM advanced packaging plant, Purdue Research Park | West Lafayette, IN | $4B | 1,000 | Under construction Construction began Apr 2026, ceremonial groundbreaking 2026-08-27; cleanroom operations 2H 2028, HBM4E volume production targeted Q3 2029 (as of 2026-08) | 2024-04 | The Korea Times (Reuters) |
| Panasonic Energy EV battery cell gigafactory | De Soto, KS | $4B | 4,000 | Operating Opened Jul 2025 making Tesla 2170 cells. Full-capacity ramp postponed indefinitely; 4 lines and 1,800 staff as of Jun 2026. Part of the plant shifts to data-center battery cells from about 2028-29 | 2022-07 | KCUR |
| Ford Motor Co. BlueOval Battery Park Michigan (LFP cells) | Marshall, MI | $3.5B | 1,700 | Operating First LFP prismatic cells shipped to Louisville Assembly for Ford prototypes (Ford, 2026-11-18). Pack plant due 2027. 500+ employees as of Jun 2026 | 2023-02 | Ford Motor Co. (From the Road) |
| Eli Lilly and Co. Lehigh Valley injectables/device site | Fogelsville, PA | $3.5B | 850 | Under construction Broke ground 2026-11-12 in Upper Macungie Twp; expected operational by 2031 | 2026-01 | Eli Lilly (PR Newswire) |
| American Honda Motor Co. New Central Ohio auto plant (hybrid/flex) | Marysville, OH | $3B | 2,000 | Announced Announced 2026-11-09. Sited between the East Liberty and Marysville plants; up to 240,000 vehicles/yr from 2029, pending approvals | 2026-11 | Honda News |
| Ultium Cells (GM / LG Energy Solution) Ultium Cells plant 2 | Spring Hill, TN | $2.6B | 1,300 | Operating Paused Jan 2026 (710 furloughed). Mar 2026: retooling to LFP cells for stationary storage (for LGES Vertech); workers recalled, output targeted Q2 2026 | 2021-04 | Electrek |
| Corning (with Apple) iPhone/Apple Watch cover glass line | Harrodsburg, KY | $2.5B | — | Operating Existing plant expanding; Corning's Kentucky workforce to grow 50%; all new iPhone and Apple Watch cover glass to be made there by end of 2026 (as of 2026-02) | 2025-08 | Apple Newsroom |
| Gotion Inc. EV battery component plant (Green Charter Twp) | Big Rapids, MI | $2.4B | 2,350 | Canceled State default letter 2025-09-17; Michigan declared the project dead Oct 2025 and seeks about $23.6M back. Gotion sued the township in Jun 2026 | 2022-10 | Bridge Michigan |
| Ultium Cells (GM / LG Energy Solution) Ultium Cells plant 1 | Warren, OH | $2.3B | — | Operating Idled Jan 2026 (about 1,330 laid off). Restart of NCMA pouch-cell lines announced Aug 2026 with about 1,400 workers; over 45 GWh capacity | 2019-12 | InsideEVs |
| Bosch Roseville silicon carbide chip fab conversion | Roseville, CA | $2B | — | Operating SiC sample production began (announced 2026-07-13); first commercial 200mm SiC chips planned for 2026; site employs >300 (as of 2026-07) | 2023-04 | City of Roseville |
| LG Energy Solution (formerly Ultium Cells plant 3) LGES Michigan-Lansing battery plant | Lansing, MI | $2B | 1,700 | Operating Production began 2026-08-18: LFP storage cells and NMC cells for Toyota EVs; about 900 staff, more than 35 GWh at full scale | 2022 | LG Energy Solution |
| Scout Motors (Volkswagen Group) Scout Production Center | Blythewood, SC | $2B | 4,000 | Delayed Validation builds started Nov 2026. Customer deliveries of Traveler and Terra now 2028, versus the original 2026 target | 2023 | Electrek |
| First Solar Louisiana thin-film module factory | New Iberia, LA | $1.1B | 826 | Operating Production began quietly Jul 2025; ribbon cutting Nov 2025 with 700+ employees | 2023 | Electrek |
| Wistron (for NVIDIA) D1 NVIDIA AI superchip/board plant | Fort Worth, TX | $0.7B | 1,000 | Operating Mass production began Jul 2026, grand opening 2026-07-21; producing NVIDIA GB300 superchips, second cell for Vera Rubin; >500 jobs, 1,000 planned by end-2026 (as of 2026-07) | 2025-04 | NVIDIA Blog |
| Absolics (SKC) Glass substrate plant for advanced packaging | Covington, GA | $0.6B | 410 | Delayed Plant built; mass production originally planned 1H 2024, slipped repeatedly; mass-production samples in customer qualification, mass production targeted by end-2026 (as of 2026-08) | 2021 | Tom's Hardware |
| Apple Houston AI server factory (Private Cloud Compute servers) | Houston, TX | — | — | Operating AI server production began 2025 ahead of schedule (shipping since Oct 2025); Mac mini production to start at new factory on the Houston site later in 2026 (as of 2026-02) | 2025-02 | Apple Newsroom |
| Foxconn (for NVIDIA) NVIDIA AI supercomputer / GB300 system factory | Houston, TX | — | — | Under construction NVIDIA said in Apr 2025 that Texas plants would ramp in 12-15 months; Foxconn still described as building the Houston factory for NVIDIA AI systems incl. GB300 tray modules, no production start confirmed (as of 2026-08) | 2025-04 | NVIDIA Blog |
| HL-GA Battery Co. (Hyundai Motor Group / LG Energy Solution) Metaplant battery cell JV plant | Ellabell, GA | — | — | Under construction Site of the 2025-09-04 ICE raid. As of 2026-04-15 the plant had 500+ employees and was set to open later in April 2026 after the raid delay. Opening was not independently confirmed | 2023-05 | Atlanta Journal-Constitution |
| SK On (formerly BlueOval SK, Ford/SK On JV) BlueOval City battery plant | Stanton, TN | — | — | Delayed JV split announced Dec 2025, SK On takes sole ownership (Tennessee Lookout reports it took control May 2026). Construction complete, about 300 staff; commercial production now expected 2028, including energy storage | 2021-09 | Tennessee Lookout (via Yahoo News) |
| Ford Motor Co. (Ford Energy; formerly BlueOval SK) BlueOval SK Battery Park, converted to energy storage | Glendale, KY | — | — | Under construction BlueOval SK JV dissolved (announced Dec 2025, Ford took the KY plants). EV cell output ended with about 1,500 layoffs. Being repurposed for LFP energy storage under Ford Energy (launched 2026-05-11); first deliveries planned late 2027 | 2021-09 | Ford Motor Co. |
| First Solar South Carolina Series 6 module finishing line | Gaffney, SC | — | — | Announced Announced Nov 2025, expected online 2027 (Electrek, Nov 2025); pv magazine (Nov 2026) lists Gaffney as a 2026 capex driver | 2025-11 | Electrek |
Put AI to work
Find the AI opportunities hiding in your plant.
Genvo, our implementation partner, works with manufacturers to pick the right first project, connect the systems you already run and put AI agents and tools into daily use, with people approving what goes out.
Assessments and consultations are provided by Genvo. How our partnership works.