Case study · Chemicals

P&G Rakona replaces lab sampling with real-time quality analytics

Manual batch sampling missed deviations until after production, and lab analysis delayed product release.

Manufacturer
Procter & Gamble
Use cases
2
Evidence
Independently assessed
Year
2019

Independently assessed  This result was assessed or published by a party other than the manufacturer or its vendor (a World Economic Forum Lighthouse assessment, a government or institute report, or a peer-reviewed paper).

The challenge

Manual batch sampling missed deviations until after production, and lab analysis delayed product release.

The approach

P&G added real-time analytics on in-line sensors (pH, colour, viscosity, active level) that can stop the line, plus an analytical supply-chain synchronization and simulation tool.

Reported improvements

Percent change as reported by the source; hover for the exact wording

Reworking and complaints↓ 50%
Inventory↓ 35%

2 use cases in this implementation

  1. Quality prediction & virtual metrology

    Real-time analytics on in-line sensor data for in-process quality control and release.

    • reworking and complaints have been cut by 50%
    • a throughput time reduction of 24 hours
  2. Inventory & materials optimization

    Analytical modelling and simulation synchronize the end-to-end supply chain.

    • reduced inventory by 35% in three years

Outcomes as reported by the source. We do not adjust, combine or extrapolate reported figures.

Related case studies

Put AI to work

Find the AI opportunities hiding in your plant.

Genvo, our implementation partner, works with manufacturers to pick the right first project, connect the systems you already run and put AI agents and tools into daily use, with people approving what goes out.

Assessments and consultations are provided by Genvo. How our partnership works.