Chip fabs and electronics plants are the largest single wave of U.S. factory construction in decades, backed in part by the CHIPS and Science Act. We track 20 projects in 11 states with $614 billion in announced investment; 2 are delayed, paused or canceled.
| Company & project | Location | Announced investment | Jobs announced | Status | Year | Source |
|---|---|---|---|---|---|---|
| TSMC TSMC Arizona (Fab 21) gigafab campus | Phoenix, AZ | $265B | — | Operating Fab 1 (N4) in high-volume production since late 2024; Fab 2 construction complete, 3nm production expected 2027; Fab 3 (N2/A16) broke ground 2025; Arizona workforce >3,500 (as of 2026-07) | 2020-05 | ENR (Engineering News-Record) |
| Micron Technology New York DRAM megafab (up to 4 fabs) | Clay, NY | $100B | 9,000 | Under construction Groundbreaking delayed from 2024 by environmental/wetlands permitting; broke ground 2026-01-16; first foundations placed Jul 2026; first fabs targeted to come online ~2030 (as of 2026-07) | 2022 | The Register |
| Micron Technology Boise DRAM fabs ID1 and ID2 | Boise, ID | $50B | 2,000 | Under construction ID1 first DRAM wafer output expected mid-2027; ID2 first wafers expected late 2028 (as of 2026-10) | 2022 | Idaho Statesman via The Spokesman-Review |
| Texas Instruments Sherman 300mm analog fabs SM1-SM4 | Sherman, TX | $40B | 3,000 | Operating Groundbreaking May 2022; SM1 began production 2025-12-17 and is ramping with demand; SM2 construction reported complete, later fabs to follow demand (as of 2025-12) | 2021-11 | Dallas Innovates |
| Samsung Electronics Taylor leading-edge logic fab (2nm) | Taylor, TX | $37B | 3,500 | Under construction Mass production originally planned for 2024, later pushed to 2026; Samsung says target is readiness for mass production by end-2026; Tesla AI5/AI6 2nm chips slated for the fab, volume output expected 2027 (as of 2026-07) | 2021 | NIST / U.S. Department of Commerce |
| Intel Fab 52 (Intel 18A) at Ocotillo campus | Chandler, AZ | $32B | — | Operating Fab 52 in high-volume 18A production (Panther Lake, Clearwater Forest) since late 2025; sister Fab 62 installing equipment, operations expected by end of 2028 (as of 2026-10) | 2021 | Igor's Lab |
| Intel Ohio One leading-edge fab campus | New Albany, OH | $28B | 3,000 | Delayed Originally due to open 2025; Feb 2025 update moved Mod 1 completion to 2030 with operations 2030-2031 and Mod 2 operations to 2032; construction continuing at slower pace, first major structural truss installed on Fab 1 (as of 2026-10) | 2022-01 | Intel Newsroom |
| Amkor Technology Advanced packaging and test campus | Peoria, AZ | $12B | 3,500 | Under construction Phase 1 broke ground Oct 2025, production slated for early 2028; Phase 2 construction to begin late 2027, finishing by end of 2029 (as of 2026-09) | 2023-11 | The Next Web |
| GlobalFoundries Fab 8 expansion and new Malta fab | Malta, NY | $11.6B | 1,500 | Announced Existing Fab 8 operating; construction of new Malta fab was expected to begin in 2025, but no confirmed 2026 construction update found (as of 2026-11) | 2024-02 | New York Governor's Office |
| Texas Instruments LFAB2 300mm wafer fab | Lehi, UT | $11B | 800 | Under construction Groundbreaking Nov 2023; foundation poured 2025; final truss installed 2026; production originally targeted as early as 2026, no confirmed production start found (as of 2026-10) | 2023-02 | Texas Instruments |
| GlobalWafers (GlobiTech) 300mm silicon wafer plant | Sherman, TX | $7.5B | 650 | Operating Grand opening 2025-05-15, first fully integrated 300mm wafer line built in U.S. in over two decades; phase two expansion being prepared subject to customer commitments (as of 2026-01) | 2022-06 | Evertiq |
| Wolfspeed John Palmour Manufacturing Center (200mm SiC materials) | Siler City, NC | $5B | 1,800 | Operating First crystal furnaces powered Jun 2024; reached production readiness late fiscal 2025; Wolfspeed filed Chapter 11 in Jun 2025 and emerged 2025-09-29 with ~70% less debt (as of 2025-10) | 2022 | Compound Semiconductor |
| Applied Materials EPIC Center (semiconductor equipment R&D) | Sunnyvale, CA | $5B | — | Operating Opened 2026-10-12 with founding partners TSMC, Intel, Samsung, Micron, SK hynix; 600,000 sq ft with ~4 acres of cleanroom (as of 2026-10) | 2023 | Evertiq |
| SK hynix HBM advanced packaging plant, Purdue Research Park | West Lafayette, IN | $4B | 1,000 | Under construction Construction began Apr 2026, ceremonial groundbreaking 2026-08-27; cleanroom operations 2H 2028, HBM4E volume production targeted Q3 2029 (as of 2026-08) | 2024-04 | The Korea Times (Reuters) |
| Corning (with Apple) iPhone/Apple Watch cover glass line | Harrodsburg, KY | $2.5B | — | Operating Existing plant expanding; Corning's Kentucky workforce to grow 50%; all new iPhone and Apple Watch cover glass to be made there by end of 2026 (as of 2026-02) | 2025-08 | Apple Newsroom |
| Bosch Roseville silicon carbide chip fab conversion | Roseville, CA | $2B | — | Operating SiC sample production began (announced 2026-07-13); first commercial 200mm SiC chips planned for 2026; site employs >300 (as of 2026-07) | 2023-04 | City of Roseville |
| Wistron (for NVIDIA) D1 NVIDIA AI superchip/board plant | Fort Worth, TX | $0.7B | 1,000 | Operating Mass production began Jul 2026, grand opening 2026-07-21; producing NVIDIA GB300 superchips, second cell for Vera Rubin; >500 jobs, 1,000 planned by end-2026 (as of 2026-07) | 2025-04 | NVIDIA Blog |
| Absolics (SKC) Glass substrate plant for advanced packaging | Covington, GA | $0.6B | 410 | Delayed Plant built; mass production originally planned 1H 2024, slipped repeatedly; mass-production samples in customer qualification, mass production targeted by end-2026 (as of 2026-08) | 2021 | Tom's Hardware |
| Apple Houston AI server factory (Private Cloud Compute servers) | Houston, TX | — | — | Operating AI server production began 2025 ahead of schedule (shipping since Oct 2025); Mac mini production to start at new factory on the Houston site later in 2026 (as of 2026-02) | 2025-02 | Apple Newsroom |
| Foxconn (for NVIDIA) NVIDIA AI supercomputer / GB300 system factory | Houston, TX | — | — | Under construction NVIDIA said in Apr 2025 that Texas plants would ramp in 12-15 months; Foxconn still described as building the Houston factory for NVIDIA AI systems incl. GB300 tray modules, no production start confirmed (as of 2026-08) | 2025-04 | NVIDIA Blog |
AI on these factory floors
Quality
Cameras and computer vision models inspect parts on the line to catch surface, assembly and dimensional defects consistently.
Quality
Predict product quality from live process data so problems are caught before parts are measured, tested or shipped.
Quality
Machine learning sifts process, material and equipment data to narrow down which factors are actually driving defects and yield loss.
Operations & production
Models recommend or automatically adjust process setpoints to keep quality on target while improving yield, throughput and energy use.
Operations & production
Measure and model energy use by line and utility system, then cut waste through better scheduling, setpoints and load management.
Supply chain & procurement
Monitor suppliers, shipments and external events to flag disruptions early and see which parts, orders and customers are exposed.
Put AI to work
Genvo, our implementation partner, works with manufacturers to pick the right first project, connect the systems you already run and put AI agents and tools into daily use, with people approving what goes out.
Assessments and consultations are provided by Genvo. How our partnership works.