Innovation Atlas

Semiconductors & electronics

Chip fabs and electronics plants are the largest single wave of U.S. factory construction in decades, backed in part by the CHIPS and Science Act. We track 20 projects in 11 states with $614 billion in announced investment; 2 are delayed, paused or canceled.

Projects
20
States
11
Announced
$614B
Delayed, paused or canceled
2
Company & projectLocationAnnounced investmentJobs announcedStatusYearSource
TSMC
TSMC Arizona (Fab 21) gigafab campus
Phoenix, AZ$265B—Operating
Fab 1 (N4) in high-volume production since late 2024; Fab 2 construction complete, 3nm production expected 2027; Fab 3 (N2/A16) broke ground 2025; Arizona workforce >3,500 (as of 2026-07)
2020-05ENR (Engineering News-Record)
Micron Technology
New York DRAM megafab (up to 4 fabs)
Clay, NY$100B9,000Under construction
Groundbreaking delayed from 2024 by environmental/wetlands permitting; broke ground 2026-01-16; first foundations placed Jul 2026; first fabs targeted to come online ~2030 (as of 2026-07)
2022The Register
Micron Technology
Boise DRAM fabs ID1 and ID2
Boise, ID$50B2,000Under construction
ID1 first DRAM wafer output expected mid-2027; ID2 first wafers expected late 2028 (as of 2026-10)
2022Idaho Statesman via The Spokesman-Review
Texas Instruments
Sherman 300mm analog fabs SM1-SM4
Sherman, TX$40B3,000Operating
Groundbreaking May 2022; SM1 began production 2025-12-17 and is ramping with demand; SM2 construction reported complete, later fabs to follow demand (as of 2025-12)
2021-11Dallas Innovates
Samsung Electronics
Taylor leading-edge logic fab (2nm)
Taylor, TX$37B3,500Under construction
Mass production originally planned for 2024, later pushed to 2026; Samsung says target is readiness for mass production by end-2026; Tesla AI5/AI6 2nm chips slated for the fab, volume output expected 2027 (as of 2026-07)
2021NIST / U.S. Department of Commerce
Intel
Fab 52 (Intel 18A) at Ocotillo campus
Chandler, AZ$32B—Operating
Fab 52 in high-volume 18A production (Panther Lake, Clearwater Forest) since late 2025; sister Fab 62 installing equipment, operations expected by end of 2028 (as of 2026-10)
2021Igor's Lab
Intel
Ohio One leading-edge fab campus
New Albany, OH$28B3,000Delayed
Originally due to open 2025; Feb 2025 update moved Mod 1 completion to 2030 with operations 2030-2031 and Mod 2 operations to 2032; construction continuing at slower pace, first major structural truss installed on Fab 1 (as of 2026-10)
2022-01Intel Newsroom
Amkor Technology
Advanced packaging and test campus
Peoria, AZ$12B3,500Under construction
Phase 1 broke ground Oct 2025, production slated for early 2028; Phase 2 construction to begin late 2027, finishing by end of 2029 (as of 2026-09)
2023-11The Next Web
GlobalFoundries
Fab 8 expansion and new Malta fab
Malta, NY$11.6B1,500Announced
Existing Fab 8 operating; construction of new Malta fab was expected to begin in 2025, but no confirmed 2026 construction update found (as of 2026-11)
2024-02New York Governor's Office
Texas Instruments
LFAB2 300mm wafer fab
Lehi, UT$11B800Under construction
Groundbreaking Nov 2023; foundation poured 2025; final truss installed 2026; production originally targeted as early as 2026, no confirmed production start found (as of 2026-10)
2023-02Texas Instruments
GlobalWafers (GlobiTech)
300mm silicon wafer plant
Sherman, TX$7.5B650Operating
Grand opening 2025-05-15, first fully integrated 300mm wafer line built in U.S. in over two decades; phase two expansion being prepared subject to customer commitments (as of 2026-01)
2022-06Evertiq
Wolfspeed
John Palmour Manufacturing Center (200mm SiC materials)
Siler City, NC$5B1,800Operating
First crystal furnaces powered Jun 2024; reached production readiness late fiscal 2025; Wolfspeed filed Chapter 11 in Jun 2025 and emerged 2025-09-29 with ~70% less debt (as of 2025-10)
2022Compound Semiconductor
Applied Materials
EPIC Center (semiconductor equipment R&D)
Sunnyvale, CA$5B—Operating
Opened 2026-10-12 with founding partners TSMC, Intel, Samsung, Micron, SK hynix; 600,000 sq ft with ~4 acres of cleanroom (as of 2026-10)
2023Evertiq
SK hynix
HBM advanced packaging plant, Purdue Research Park
West Lafayette, IN$4B1,000Under construction
Construction began Apr 2026, ceremonial groundbreaking 2026-08-27; cleanroom operations 2H 2028, HBM4E volume production targeted Q3 2029 (as of 2026-08)
2024-04The Korea Times (Reuters)
Corning (with Apple)
iPhone/Apple Watch cover glass line
Harrodsburg, KY$2.5B—Operating
Existing plant expanding; Corning's Kentucky workforce to grow 50%; all new iPhone and Apple Watch cover glass to be made there by end of 2026 (as of 2026-02)
2025-08Apple Newsroom
Bosch
Roseville silicon carbide chip fab conversion
Roseville, CA$2B—Operating
SiC sample production began (announced 2026-07-13); first commercial 200mm SiC chips planned for 2026; site employs >300 (as of 2026-07)
2023-04City of Roseville
Wistron (for NVIDIA)
D1 NVIDIA AI superchip/board plant
Fort Worth, TX$0.7B1,000Operating
Mass production began Jul 2026, grand opening 2026-07-21; producing NVIDIA GB300 superchips, second cell for Vera Rubin; >500 jobs, 1,000 planned by end-2026 (as of 2026-07)
2025-04NVIDIA Blog
Absolics (SKC)
Glass substrate plant for advanced packaging
Covington, GA$0.6B410Delayed
Plant built; mass production originally planned 1H 2024, slipped repeatedly; mass-production samples in customer qualification, mass production targeted by end-2026 (as of 2026-08)
2021Tom's Hardware
Apple
Houston AI server factory (Private Cloud Compute servers)
Houston, TX——Operating
AI server production began 2025 ahead of schedule (shipping since Oct 2025); Mac mini production to start at new factory on the Houston site later in 2026 (as of 2026-02)
2025-02Apple Newsroom
Foxconn (for NVIDIA)
NVIDIA AI supercomputer / GB300 system factory
Houston, TX——Under construction
NVIDIA said in Apr 2025 that Texas plants would ramp in 12-15 months; Foxconn still described as building the Houston factory for NVIDIA AI systems incl. GB300 tray modules, no production start confirmed (as of 2026-08)
2025-04NVIDIA Blog

AI on these factory floors

Use cases for semiconductors & electronics

Quality

Visual quality inspection

Cameras and computer vision models inspect parts on the line to catch surface, assembly and dimensional defects consistently.

Computer visionMachine learning
Proven, scaling8 software companies

Quality

Quality prediction & virtual metrology

Predict product quality from live process data so problems are caught before parts are measured, tested or shipped.

Machine learningIndustrial IoT & edge
Proven, scaling2 software companies

Quality

Root-cause analysis for quality & yield

Machine learning sifts process, material and equipment data to narrow down which factors are actually driving defects and yield loss.

Machine learningGenerative AI & LLMs
Proven, scaling8 software companies

Operations & production

Process & yield optimization

Models recommend or automatically adjust process setpoints to keep quality on target while improving yield, throughput and energy use.

Machine learningOptimization & planningIndustrial IoT & edge
Proven, scaling7 software companies

Operations & production

Energy & utilities optimization

Measure and model energy use by line and utility system, then cut waste through better scheduling, setpoints and load management.

Machine learningOptimization & planningIndustrial IoT & edge
Proven, scaling0 software companies

Supply chain & procurement

Supply chain risk & visibility

Monitor suppliers, shipments and external events to flag disruptions early and see which parts, orders and customers are exposed.

Machine learningGenerative AI & LLMs
Proven, scaling6 software companies

Put AI to work

Find the AI opportunities hiding in your plant.

Genvo, our implementation partner, works with manufacturers to pick the right first project, connect the systems you already run and put AI agents and tools into daily use, with people approving what goes out.

Assessments and consultations are provided by Genvo. How our partnership works.