Case study · Electrical equipment & batteries

Lake Cable raises first-pass yield 25% with Oden extrusion analytics

The wire and cable maker was missing production targets without knowing why, and engineers spent 3-5 days per quality issue inspecting, scrapping and re-running cable.

Manufacturer
Lake Cable
Use cases
2
Evidence
Vendor-reported
Year
2025

Vendor-reported  This result comes from a vendor's case study. Treat figures as claims until you can confirm them with the manufacturer or in a pilot of your own.

The challenge

The wire and cable maker was missing production targets without knowing why, and engineers spent 3-5 days per quality issue inspecting, scrapping and re-running cable.

The approach

Lake Cable used Oden's analytics to categorize downtime, detect anomalies in extrusion runs, identify problem process variables and size their production impact.

Reported improvements

Percent change as reported by the source; hover for the exact wording

Process engineer productivity↑ 30%
First-pass yield↑ 25%
Monthly capacity↑ 8%

2 use cases in this implementation

  1. Root-cause analysis for quality & yield

    Anomaly detection on extrusion process data pinpoints root causes of quality failures.

    • 25% increase in first-pass yield
    • 30% increase in process engineer productivity
  2. Machine monitoring & OEE analytics

    Line analytics categorize downtime and reveal capacity levers.

    • 8% increase in monthly capacity

Outcomes as reported by the source. We do not adjust, combine or extrapolate reported figures.

Related case studies

Put AI to work

Find the AI opportunities hiding in your plant.

Genvo, our implementation partner, works with manufacturers to pick the right first project, connect the systems you already run and put AI agents and tools into daily use, with people approving what goes out.

Assessments and consultations are provided by Genvo. How our partnership works.